Skip to content
CIA Minera Lajón Contact
EN
  1. Home
  2. Company

A Peruvian company focused on gold ore

We buy, sell and process gold-bearing ores, oxides and sulphides, at our processing plant in Chicama.

Who we are

Company name
CIA MINERA LAJON S.A.C.
Business activity
Purchase, sale and processing of gold-bearing ores
Processing plant
Chicama, Trujillo area
Office
Lima

CIA MINERA LAJON S.A.C. is a Peruvian company engaged in the purchase, sale and processing of gold-bearing ores, oxides and sulphides.

At our leaching processing plant we treat ores containing gold and silver. The plant also buys gold-bearing ore from mining operations in a sustainable way, with good recoveries.

The company owns the land where the plant operates, with full legal and physical title, in a desert area of Chicama with no significant farming or livestock activity.

Expanding mining horizons: an efficient polymetallic operation

Hover over each image to see the details of that part of the process.

The plant

Chicama processing plant

Our own tank cyanidation plant, treating high- and low-grade gold-bearing ores with gold and silver, in continuous operation.

Leaching
40 t/day
Operation
24 h, in 2 shifts of 12 h
Location
Chicama, Trujillo area
Aerial view of the plant: grinding building, tanks and pondsThe plant
Ore stockpiles and conveyor of the crushing circuitReception and crushing
Staff with protective equipment next to the ball millGrinding and sampling
Green leaching tanks with yellow railingsLeaching and recovery
  • 40t/dayTank leaching (CIL)
  • 30t/hCrushing circuit throughput
  • 10hFor results from the plant laboratory
  • 24hOf daily operation, in 2 shifts

The plant today

Photos taken at the Chicama plant in February 2026.

Row of leaching tanks seen from the air, with the laboratory and the grinding building
Leaching tanks and laboratory
Crusher and conveyor with yellow railings in the crushing circuit
Crushing
Green hopper and conveyor belt to grinding
Hopper and conveyor to grinding
Overhead view of the conveyor, the grinding building and the ponds
Conveyor, grinding and ponds
Metal column and equipment in the recovery area
Recovery area
Pond lined with black geomembrane
Geomembrane-lined pond

Safety and environment

We work with safety controls at the gatehouse and in the plant, and with permits for the use of resources.

  • Access control at the gatehouseCheck of the vehicle, the load and the driver's documents, with a breathalyser test.
  • Mandatory personal protective equipmentHelmet with chin strap, reflective vest, steel-toe boots and safety glasses.
  • Covered loadsTrucks enter with the load covered by a tarpaulin to prevent dust spreading.
  • Tailings in lined pondsProcess tailings go to ponds waterproofed with geomembrane.
  • Water with a permitSupply from the Chicama canal, with a permit from the irrigation users' board.
  • Barren landThe plant is in a flat desert area with no significant farming or livestock activity.

How the plant was built

Four phases, from barren land to a plant that runs 24 hours a day.

Aerial view of the prepared site with ore yards1

Site preparation

Completed
  • Earthworks
  • Operation of heavy equipment and machinery
  • Waste rock handling
  • Levelling and compaction
Civil works with tanks and structures under construction2

Construction of facilities

Completed
  • Civil works and structures
  • Transport and installation of equipment and machinery
  • Services and facilities
Processing plant in operation, seen from the air3

Plant operation

Up and running
  • Supply of our own resources
  • Operation, maintenance and cleaning of equipment
  • Transport and handling of the final product
  • Waste management
Aerial view of the plant expansion works4

Expansion

In progress
  • More operating capacity, efficiently
  • Design based on data from qualified staff
  • In line with current regulations and laws
  • With experience in similar projects
Ore yards seen from the air
Ore yards
Conveyor belt between retaining walls
Conveyor belt